← wbsgantt home

Insights

The Six Moments a Project Falls Apart — a series of essays for practicing PMs.

The Six Moments a Project Falls Apart — Part 1
The Work You Missed Was Never "Unplanned"
"Who was supposed to do this?" three weeks in — catching missed work at planning time with the WBS 100% Rule, 8/80 Rule, and mutual exclusivity.
The Six Moments a Project Falls Apart — Part 2
A Plan Made in Excel Starts Dying the Day It's Born
WBS in one file, Gantt in another — two weeks later they disagree. Why plan artifacts and execution data belong in a single model.
The Six Moments a Project Falls Apart — Part 3
Your Schedule Didn't Slip — Your Baseline Disappeared
The meeting where no one can answer "what was the original plan?" — the power of baseline snapshots and change control.
The Six Moments a Project Falls Apart — Part 4
The Lie Called "80% Done"
Progress stuck at 80% for eight weeks — EVM basics (PV/EV/AC, SPI/CPI) and honest progress rules.
The Six Moments a Project Falls Apart — Part 5
WBS and Agile Were Never at War
Caught between "we're agile, we don't do WBS" and contractual reporting — decomposing the What (WBS) and executing the How (sprints).
The Six Moments a Project Falls Apart — Part 6
The PM Too Busy Reporting to Manage
The PM spending 10 hours a week on reports — deliverables should be extracted, not authored.
Case Study
We Let Claude Build an Entire SI Project's WBS
Connected over MCP, Claude drafted, refined, scheduled, and defined the WBS for a 6-month manufacturing ERP build — recall by machine, commitment by human.
Case Study
This Week's Status Report Was Extracted, Not Written
One export button on the ERP project from our last case study produced four sheets — overview, WBS, weekly, monthly — and a clear boundary between what fills itself and what only a human should write.
Case Study
We Bolted a Risk Register onto That ERP Project
On the same ERP project, we identified, assessed, responded to, and monitored eight risks on a 5x5 matrix — a risk pinned to a WBS node rides along every time you look at the plan.
Case Study
Seven Weeks In, That ERP Project Started to Slip
With a baseline set and progress in, SPI 0.84 raised the alarm first — an execution report tracing the slip down to the responsible work packages.
Case Study
When Was This Deadline, Originally?
Right after a schedule revision, we replayed it in the change history — field-level old→new with who and when, and what never gets recorded.
Case Study
If One Task Slips Three Days, How Late Is the Project?
We fed in +3 days and CPM recomputed the chain — zero delay at first, until a missing line surfaced. Fill it in, and the critical path moved house.
Case Study
We Wrecked the Whole Plan. Undo Wasn't Enough
Pinned BL-2 as a checkpoint right before a risky edit, then rolled a plan — a whole phase wiped out by one accident — back to the snapshot: auto backup, progress preserved, all-or-nothing.